Cedar Park & Brushy Creek (Avery Ranch)

Ride Host Contact Info
Andy Coulbeck, 512-203-2156, acoulbeck@gmail.com
Start Date and Time
Sat, 06/21/2025 - 08:00 am
Ride Rating
C
Hill Rating
1
Ride Length (miles)
47
Ride Description
  • A lengthy but fairly flat urban ride from Avery Ranch towards the Arboretum then north through Cedar Park and Brushy Creek. Hill rating 1-2 depending on one's perspective.
  • Starting from Summer Moon Coffee at Avery Ranch Blvd and Parmer Ln. Park your vehicle close to Avery Ranch Blvd.
  • A couple of small stretches on the shoulder of Parmer Ln (1.5 miles total) including a busy crossing of 1431.
  • Store stop: Shell gas station at 26.5 miles.
  • Lunch/coffee: Summer Moon Coffee, post-ride.
  • For self-confident riders who are comfortable and safe in a group riding situation which could (depending on the route) include pace-line riding, hilly terrain and exposure to urban traffic. 
  • Helmets are mandatory.
  • Route posted in RWGPS format.
  • Ride will be “no drop”, assuming riders have properly matched themselves to the ride description, average speed and terrain.
  • Please arrive early enough to prepare yourself + bike, to be ready for an on-time departure.
  • In case of inclement weather, check this web site early on the morning of the ride. 
Cancelled or Not
Not Cancelled